Quick Summary
|
If your priority is…
|
Specify this…
|
|---|---|
|
Flush interior line on covered patios
|
Flush threshold + concealed sub-sill tray
|
|
Accessibility (barrier-free)
|
Low-profile sill ≤ 12.7 mm with dual weather seals
|
|
Unroofed coastal / storm exposure
|
Weather-rated step sill tested at the project design pressure
|
|
Long-life seals
|
Continuous EPDM gaskets, not PVC
|
|
Verifiable performance
|
Water penetration test report with matching specimen size
|
Why Flush Thresholds Leak: The Physics of Water Ingress
1. The Hydrostatic Pressure Trap
2. Shallow Track Capacity
3. Missing or Clogged Sub-Sill Drainage
The 4 Engineering Pillars of Bifold Door Water Leakage Prevention
Pillar 1: Concealed Sub-Sill Drainage Trays
Pillar 2: Continuous EPDM Gasket Systems
Pillar 3: Cascading Weep-Hole Baffles
Pillar 4: Water-Tightness Testing (ASTM E331 / EN 12208)
Flush vs. Step Sill: A Buyer Decision Tree
|
Exposure
|
Recommended threshold
|
|---|---|
|
Covered patio / loggia, interior divider
|
Fully flush (0–5 mm) with sub-sill tray
|
|
Residential patio, accessibility priority
|
Low-profile sill (≤ 12.7 mm) with dual seals
|
|
Unroofed coastal / high-rise / storm zone
|
Weather-rated step sill (25–50 mm), tested at the project design pressure (e.g., 600 Pa)
|
Bifold Door Water Leakage Prevention: Specification Checklist
|
Item
|
What to request
|
Red flag
|
|---|---|---|
|
Sub-sill
|
Extruded drainage tray + weep layout drawing
|
“Flush track” with no sub-sill detail
|
|
Weep holes
|
One-way flaps / cascading baffles
|
Open holes, no baffles
|
|
Gaskets
|
Continuous EPDM, double/triple at interlocks
|
Generic PVC or brush seals only
|
|
Water test
|
ASTM E331 / EN 12208 report with specimen size
|
Brochure claim, no report
|
|
Hardware
|
Stainless rollers with load rating
|
No load data
|
|
Threshold selection
|
Matched per elevation (decision tree)
|
Same threshold on every elevation
|
|
Installation
|
Sill slope, flashing, exterior drainage path
|
Direct-to-slab, no drainage
|
|
Maintenance
|
Cleanable track + accessible weep locations
|
Sealed, inaccessible channel
|
Representative Project Example (Illustrative Specification)
- Project type: beachfront villa (representative)
- Configuration: 5-panel bifold, 4.8 m opening
- Covered loggia elevation: flush threshold + sub-sill tray + EPDM triple gaskets
- Unroofed terrace elevation: 25 mm weather-rated step sill, system tested at e.g. 600 Pa
- Design intent: track infiltration discharged via sub-sill weeps; no interior overflow at the design storm
How Starveil Engineers Water-Tight Door Systems
- Integrated sub-sill channels: factory-machined drainage trays with hidden exterior discharge slots in every custom threshold.
- Heavy-duty rollers: stainless bottom-running assemblies rated for panels over 300 kg, keeping seals correctly compressed.
- PA66 thermal barriers: polyamide breaks that reduce interior-side condensation (“sweating”) in cooled or heated spaces.
- Global track record: 1,500+ delivered projects across North America, Europe, Australia, and tropical coastal resorts.
Send These 5 Items for a Threshold Engineering Review
- Elevation drawings / opening sizes
- Site location and exposure (covered vs. unroofed, coastal or not)
- Threshold preference (flush vs. step; accessibility requirements)
- Door schedule (panel count and sizes)
- Required test standards (ASTM E331 / EN 12208, target pressure)